

Map 1 — Location: A Strategic Address in an Established Mining Region

Map 2 — Regional Geology: The Right Address for a Silver-Gold System

Map 3 — Local Geology: A Large, Structurally Controlled Target
An independent JORC 2012 compliant reported Mineral Resource Estimate (MRE) and Exploration Target completed by Geminas Advisory shows an initial maiden resource at Tassa confirming a large-scale epithermal system containing at least 25.5Moz of Silver at 42.73 g/t.1
Mineralisation starts from the surface and the Maiden MRE assumes open pit mining as the means for extraction. This marks an important milestone towards unlocking the full potential of this deposit as the next major phase of exploration ramps up.
| Classification | Tonnes (Mt) | AgEq (Moz) | AgEq (g/t) | Ag (Moz) | Ag (g/t) | Au (Moz) | Au (g/t) | Cut-off (g/t AgEq) |
|---|---|---|---|---|---|---|---|---|
| Inferred | 18.53 | 31.39 | 52.68 | 25.46 | 42.73 | 0.04 | 0.06 | 25.00 |
The updated Exploration Target has been independently prepared and is underpinned by the first integrated interpretation of more than 20 years of geological (2026-2006), geochemical and geophysical data, comprising 1,832 surface samples, 8,500m of diamond drilling, ~36kms of IP geophysics and ~70km of magnetics lines, and all reconciled with the Company’s February 2026 Maiden Inferred Mineral
Resource Estimate.

| Classification | AgEq (Moz) | Tonnes (Mt) | AgEq (g/t) |
|---|---|---|---|
| Exploration Target | 774-559 | 422-359 | 57-48 |
| Grade (g/t) | ||
|---|---|---|
| Metal | Lower | Upper |
| Ag | 42 | 49 |
| Au | 0.04 | 0.05 |
| Cu | 363 | 427 |
| Zn | 638 | 750 |
| Pb | 982 | 1,156 |
The Exploration Target has been prepared and reported in accordance with the 2012 edition of the JORC code. The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource for the target areas reported. It is uncertain if further exploration will result in the estimation of a Mineral Resource.
3 – PAT ASX Announcement: Massive Exploration Target of 774-559 Moz AgEq at Tassa, 24 April 2026.

Model showing Mineralised polygons and Exploration Target strings.
26 diamond drill holes for a total of 8,474.5m of historical drilling showing standout silver grades across wide intervals, including2

Visual representation of boreholes on the topography of the Tassa project area.
1) PAT ASX Announcement: 31.4Moz AgEq Maiden Mineral Resource at Tassa Project, 16 February, 2026
3) PAT ASX Announcement: Massive Silver Exploration Target Upgrade at Tassa, 8 May 2026

Suite 6,
245 Churchill Avenue,
Subiaco, WA 6008
E. info@patriotresources.com.au
P. 0413 621 652
Copyright © 2025 Patriot Resources. All Rights Reserved.
Website by Oliver Agency